News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 9 June 2017 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was completed on June 7 to reconfigure the battery reconditioning resistors for batteries 2 & 3 to adjust the battery trickle charge current. An associated flight software patch was uplinked to update the EPS fault detection logic on the Reconditioning Resistor Relay configuration. These changes are in response to expected efficiency drops due to aging of the solar arrays. Real-time procedures were executed on June 7 and June 8 to dump OBC-A and OBC-B memory as a follow-up to the patch. The dump will be used to update the baseline memory image maintained on the ground. A real-time procedure was executed on June 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

A Chandra press release was issued on June 6 showing time-lapse observations of the R Aquarii white dwarf+ "Mira". Symbiosis in the system leads to recurrent nova and high velocity flows. Monitoring of the system by Chandra over the past 17 years has led to the direct measurement of material moving away from the system at speeds of 600 km/s and 850 km/s, implying outbursts in the 1950's and 1980's. For details see: http://chandra.si.edu/photo/2017/raqr/

The schedule of targets for the next week is shown below and includes an observation of CXO J164710.2-455216, which was accepted as a Target of Opportunity on May 16 and is coordinated with NuStar, and an observation of Jupiter, which is a follow-up to a Director's Discretionary Time Target of Opportunity which was accepted on Jan 26 and is coordinated with XMM.



------------------------------------------
        SDSSJ083510.36+03590   ACIS-S       Jun 11
        J162410.11-002202.5    ACIS-S       Jun 12
        IC4329a                ACIS-S/HETG
        Radiation Belts                     Jun 13
        IC4329a                ACIS-S/HETG
        GX340+0                ACIS-S/HETG
        IC4329a                ACIS-S/HETG  Jun 14
        4C63.20                ACIS-S
        Radiation Belts                     Jun 15
        CXOJ164710.2-455216    ACIS-S
        GX340+0                ACIS-S/HETG  Jun 16
        PKS0745-191North       ACIS-I
        PKS0745-191West        ACIS-I
        PKS0745-191South       ACIS-I       Jun 17
        PKS0745-191East        ACIS-I
        CrX-1                  ACIS-S/HETG
        IC4329a                ACIS-S/HETG
        CrX-1                  ACIS-S/HETG
        Radiation Belts                     Jun 18
        IGRJ16479-4514         ACIS-S
        Jupiter                HRC-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports