During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Aug 1 to swap the prime solid-state recorder (SSR) from the A-side to the B-side. This swap concludes a six-month interval of health and trending data collection on SSR-A. A second real-time procedure was executed on Aug 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below and includes an observation of V404 Cygni coordinated with VLA, an observation of GRS 1915+105 coordinated with NuSTAR, ATCA, and VLT, an observation of GRB 161219B, which was accepted as a Target of Opportunity on May 8, and an observation of S255IR NIRS 3, which is a follow-up to a Target of Opportunity accepted on Dec 9. |
------------------------------------------
Radiation Belts Aug 7 CDWFS ACIS-I HZ43 HRC-S /LETG Aug 8 GRB161219B ACIS-S NGC1573 ACIS-S MOOJ2206+0906 ACIS-I GRS1915+105 ACIS-S/HETG Aug 9 spog38 ACIS-S Radiation Belts Aug 10 M17SWexC ACIS-I G11.11-0.12 ACIS-I Aug 11 NGC4460 ACIS-S 2MASSJ05011802+2237 ACIS-S UGC6484 ACIS-S V404Cygni ACIS-S SDSSJ111941.12+59510 ACIS-S Aug 12 Radiation Belts Aug 13 S255IRNIRS3 ACIS-S SDSSJ012648.08-0839 ACIS-S SPT-CLJ2312-5820 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports