News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 3 November 2017 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Nov 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

A Chandra image release was issued on Oct 31 describing observations of MACS J1149.5+2233 using Chandra, Hubble, and the VLA. This system of merging galaxy clusters is one of six such systems being studied as part of the "Frontier Fields" project. The goal is to use multiwavelength data to learn more about how galaxy clusters grow through collisions. For details see: http://chandra.harvard.edu/photo/2017/macsj1149/

The schedule of targets for the next week is shown below and includes an observation of SN2017egm, which is a follow-up to a Target of Opportunity accepted on Jun 17, and observations of NGC 5907 ULR and Uranus, which were accepted as Director's Discretionary Time Targets of Opportunity on Oct 17 and 29 respectively.



------------------------------------------
        CDWFS                  ACIS-I       Nov  6
        NGC1275                ACIS-S/HETG
        NGC5907ULX             ACIS-S       Nov  7
        Radiation                           Nov  8
        CDWFS                  ACIS-I
        SN1970G                ACIS-S
        NGC1275                ACIS-S/HETG  Nov  9
        SN2017egm              ACIS-S
        NGC1275                ACIS-S/HETG  Nov 10
        Radiation                           Nov 11
        NGC1275                ACIS-S/HETG
        CDWFS                  ACIS-I
        Uranus                 HRC-I
        CDWFS                  ACIS-I       Nov 12
        Uranus                 HRC-I
        CDWFS                  ACIS-I
        Radiation                           Nov 13

------------------------------------------

All spacecraft subsystems continued to support nominal operations.