CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 23 February 2018 9.00am EST
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Feb 19 to re-initialize the flight software Thruster Command Processing subfunction in order to prevent the occurrence of an overflow condition. The schedule of targets for the next week is shown below and includes an observation of NGC5907 ULX1, which was accepted as a Director's Discretionary Time Target of Opportunity on Feb 21, an observation of MAXI J1813-095, which was accepted as a Target of Opportunity on Feb 21, and an observation of VLA J185310-084308 coordinated with VLA. |
------------------------------------------
SDSSJ123503.02-0003 ACIS-S Feb 26 PSRJ1932+1916 ACIS-I MKN421 ACIS-S/LETG Radiation Belts Feb 27 NGC5907ULX1 ACIS-S MKN421 ACIS-S/LETG J1355+1447 ACIS-S Feb 28 MAXIJ1813-095 ACIS-S PSRJ1932+1916 ACIS-I MKN421 ACIS-S/LETG NGC5907ULX1 ACIS-S Mar 1 NGC4568 ACIS-S Radiation Belts Mar 2 SPT-CLJ2334-5308 ACIS-I J0152+3231 ACIS-S MKN421 ACIS-S/LETG NVSS210240+601510 ACIS-S Mrk1018 ACIS-S Mar 3 J0909+0354 ACIS-S SDSSJ114107.48+3225 ACIS-S VLAJ185310-084308 ACIS-I SDSSJ101152.98+5442 ACIS-S spog1558 ACIS-S NGC3756 ACIS-S NGC3448 ACIS-S Mar 4 Radiation Belts CDWFS ACIS-I CDWFS ACIS-I Mar 5 NGC3963 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports