News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 15 June 2018 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Preparations were completed for the summer 2018 eclipse season; the season contains seven eclipses and runs from Jun 18 to Jul 4. Real-time procedures were executed on Jun 14 to prepare for the first eclipse: one to activate SCS 29 and one to dump and clear the EPS glitch counters.

The schedule of targets for the next week is shown below and includes an observation of SN2018bsz, which was accepted as a Target of Opportunity on May 31, and an observation of HD 93129A, which was accepted as a Target of Opportunity on May 24 and is coordinated with NuSTAR.



------------------------------------------
        Radiation Belts                     Jun 18
        Fairall51              ACIS-S/HETG
        SN2013by               ACIS-S       Jun 19
        HD93129A               ACIS-S
        UGC05005               ACIS-S
        CDWFS                  ACIS-I
        SN2018bsz              ACIS-S       Jun 20
        Radiation Belts                     Jun 21
        CDWFS                  ACIS-I
        SDSS-C4-DR33088        ACIS-I
        CDWFS                  ACIS-I
        V1535Sco               ACIS-S       Jun 22
        CDWFS                  ACIS-I
        Fairall51              ACIS-S/HETG
        Radiation Belts                     Jun 23
        NGC4469                ACIS-S
        Fairall51              ACIS-S/HETG  Jun 24
        PSRJ1048+2339          ACIS-S
        J0907+6224             ACIS-S
        CDWFS                  ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports