Friday 3 August 2018 9.00am EDT
During the last week the observing schedule was replanned to incorporate an observation of sGRB180727A, which was accepted as a Target of Opportunity on Jul 29. Loads for the replanned schedule were uplinked on Aug 2. A scheduled observation of SN2018bsz was impacted by the replan and will be rescheduled in a future week. A real-time procedure was executed on Jul 27 to command ACIS to dump the flight software from EEPROM. The dump was compared to images maintained on the ground as a routine check. A second real-time procedure was executed on Jul 31 to swap the prime solid-state recorder (SSR) from the A-side to the B-side. This swap concludes a six-month interval of health and trending data collection on SSR-A. A third real-time procedure was executed on Aug 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below and includes an observation of Sw1644+57 coordinated with VLA. |
------------------------------------------
Radiation Belts Aug 6 4U1916-053 ACIS-S/HETG Sw1644+57 ACIS-S 4U1916-053 ACIS-S/HETG Sw1644+57 ACIS-S Radiation Belts Aug 7 NGC7212 ACIS-S 4C+04.11 ACIS-S Aug 8 zetaPup ACIS-S/HETG Radiation Belts Aug 9 SS433 ACIS-S/HETG GW170817 ACIS-S VHSJ2257-4700 ACIS-S Aug 11 PSZ2G062.46-21.35 ACIS-I NGC7212 ACIS-S VHSJ2256-4800 ACIS-S Aug 12 Radiation Belts
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports