News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 30 November 2018 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Nov 26 to perform a full-frame dark current readout of the Aspect Camera Assembly CCD during a standard one-hour comm pass. A second real-time procedure was executed on Nov 26 to turn off thermal control for the unused gyros.

The schedule of targets for the next two weeks is shown below and includes observations of 46P/Wirtanen, which are coordinated with HST, an observation of AT2018gep, which is a follow-up to a Target of Opportunity which was accepted on Sep 23, an observation of SN 2018ivc, which was accepted as a Target of Opportunity on Nov 26, an observation of SN 2011ja, which was accepted as a Director's Discretionary Time Target of Opportunity on Feb 26, and observations of an OMC Disk Sample, which was accepted as a Director's Discretionary Time Target of Opportunity on Sep 7.



------------------------------------------
       Capella                ACIS-S/HETG  Dec  2
        NGC1600                ACIS-S
        NGC1566                ACIS-S       Dec  3
        NGC1600                ACIS-S
        46P/Wirtanen (6 obs)   ACIS-S
        Radiation Belts                     Dec  4
        AT2018gep              ACIS-S
        Abell2146              ACIS-I
        Capella                ACIS-S/HETG  Dec  5
        OMCDiskSample          ACIS-S
        SN2018ivc              ACIS-S
        EC21178-5417           ACIS-S
        SN2011ja               ACIS-S
        HD244604               ACIS-S       Dec  6
        NGC1385                ACIS-S
        Abell2146              ACIS-I
        Radiation Belts                     Dec  7
        ClGJ141754+432317      ACIS-I
        SDSSJ172227.18+3207    ACIS-S
        PSRJ2313+4253          ACIS-S       Dec  8
        J03064+1853            ACIS-S
        PSRJ1952+1410          ACIS-S
        J03064+1853            ACIS-S
        Radiation Belts                     Dec  9
        RXJ1131-1231           ACIS-S
        NGC2169                ACIS-I       Dec 10
        RXJ1131-1231           ACIS-S
        JWST-DTDF-3            ACIS-I
        SDSSJ163014.63+2612    ACIS-S       Dec 11
        IC5063                 ACIS-S
        OMCDiskSample          ACIS-S
        Radiation Belts                     Dec 12
        IC5063                 ACIS-S
        46P/Wirtanen (12 obs)  ACIS-S       Dec 13
        IC5063                 ACIS-S
        JWST-DTDF-3            ACIS-I
        SN2013dk               ACIS-S       Dec 14
        NGC2169                ACIS-I
        Radiation Belts                     Dec 15
        IC5063                 ACIS-S
        J03064+1853            ACIS-S
        Abell2146              ACIS-I
        UGC11583               ACIS-S       Dec 16
        IC5063                 ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.