News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 7 December 2018 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Dec 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

A Chandra photo release was issued on Dec 4 describing observations of a bright X-ray outburst from binary system containing a white dwarf called ASASSN-16oh. The authors conclude the X-rays are the result of accretion, not nuclear fusion. For details see: http://chandra.si.edu/photo/2018/wdac/

The schedule of targets for next week is shown below and includes observations of 46P/Wirtanen, which are coordinated with HST, and an observation of an OMC Disk Sample, which was accepted as a Director's Discretionary Time Target of Opportunity on Sep 7.



------------------------------------------
        NGC2169                ACIS-I       Dec 10
        RXJ1131-1231           ACIS-S
        JWST-DTDF-3            ACIS-I
        SDSSJ163014.63+2612    ACIS-S       Dec 11
        IC5063                 ACIS-S
        OMCDiskSample          ACIS-S
        Radiation Belts                     Dec 12
        IC5063                 ACIS-S
        46P/Wirtanen (12 obs)  ACIS-S       Dec 13
        IC5063                 ACIS-S
        JWST-DTDF-3            ACIS-I
        SN2013dk               ACIS-S       Dec 14
        NGC2169                ACIS-I
        Radiation Belts                     Dec 15
        IC5063                 ACIS-S
        J03064+1853            ACIS-S
        Abell2146              ACIS-I
        UGC11583               ACIS-S       Dec 16
        IC5063                 ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports