CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 7 January 2022 9.00am EST
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jan 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Jan 9 GraLJ1537-3010 ACIS-S [VV2006]J083322.5+0 ACIS-S 2RXSJ063742.6+16235 ACIS-S Jan 10 MR2251-178 HRC-S /LETG HEPG189.430+04.404 ACIS-I SDSSJ083247.64+2302 ACIS-S GraLJ1537-3010 ACIS-S PKS1136-135 ACIS-S Jan 11 UGC4308 ACIS-S Radiation Belts Jan 12 ESO137-G034 ACIS-S MOOJ1046+2758 ACIS-I [FGC2019]NGC5846U HRC-I IRAS09104+4109 ACIS-S Jan 13 SDSSJ164235.52+4223 ACIS-S RXJ1053.7+5735 ACIS-S WISEAJ071310.46+725 ACIS-S MAXIJ0556-332 ACIS-S Jan 14 Radiation Belts ESO137-G034 ACIS-S SDSSJ164235.52+4223 ACIS-S Jan 15 UGC4107 ACIS-S [FGC2019]NGC5846U HRC-I IRAS09104+4109 ACIS-S UGC4308 ACIS-S Jan 16 SDSSJ161400.30-01100 ACIS-S PKS1150+497 ACIS-S MAXIJ0556-332 ACIS-S Radiation Belts Jan 17
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports