Friday 5 August 2022 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Aug 1 to check out HRC-S operation on the A-side electronics. As part of the continued evaluation of the HRC, the HRC 15V LVPS was successfully powered on for approximately 7 ks and an HRC-S science observation of Capella was completed. Another real-time procedure was executed on Aug 1 to swap the prime solid-state recorder (SSR) from the A-side to the B-side. This swap concludes a six-month interval of health and trending data collection on SSR-A. Additional real-time procedures were executed on Aug 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Another real-time procedure was executed on Aug 4 to uplink a flight software patch to re-configure the on board software to power down the HRC 15 volt power supply during a safing action. The schedule of targets for the next week is shown below and includes observations of DQ Tau, which are follow-up to a Director's Discretionary Time Target of Opportunity on Jul 15. |
------------------------------------------
RXCJ2014.8-2430 ACIS-S Aug 8 GDHInt33 ACIS-I DQTau ACIS-I PSZ2G161.94-48.17 ACIS-I Radiation Belts Aug 9 NGC5005 ACIS-S ColdECSBlankSky HRC-S Radiation Belts DQTau ACIS-I G10.2-0.3 ACIS-I RXCJ2014.8-2430 ACIS-S CentaurusA ACIS-S/HETG Aug 10 DQTau ACIS-I G10.2-0.3 ACIS-I RXCJ2014.8-2430 ACIS-S NGC5005 ACIS-S Aug 11 DQTau ACIS-I GDH11 ACIS-I GDH11 ACIS-I Radiation Belts NGC2366 ACIS-S ColdECSBlankSky HRC-S Aug 12 DQTau ACIS-I RXCJ2014.8-2430 ACIS-S G10.2-0.3 ACIS-I CMZMolecularCloud ACIS-I NGC5005 ACIS-S GDHInt33 ACIS-I Aug 13 RXCJ2014.8-2430 ACIS-S GDH11 ACIS-I KeplerSNR ACIS-S/HETG GX17+2 ACIS-S/HETG Radiation Belts Aug 14 IGRJ12391m1612_s1 ACIS-S GDH11 ACIS-I GDHInt33 ACIS-I GDHInt33 ACIS-I GDH11 ACIS-I GDHInt33 ACIS-I
------------------------------------------
All spacecraft subsystems except HRC continued to support nominal operations.
Return to Status Reports