Friday 30 September 2022 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Sep 23 and Sep 24 to dump OBC-B memory as a follow-up to the flight software patch on Sep 21 that updated the Thermal Secondary Database. The dump will be used to update the baseline memory images maintained on the ground. Preparations were completed for the fall 2022 eclipse season; the season contains 29 eclipses and runs from Sep 30 to Dec 13. Real-time procedures were executed on Sep 29 to prepare for the first eclipse by dumping and clearing the EPS glitch counters and activating SCS 29. The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Oct 3 RAqr ACIS-S GDHIdp53 (4 obs) ACIS-I Oct 4 RAqr ACIS-S V346Nor ACIS-I Abell141 ACIS-S V346Nor ACIS-I Abell141 ACIS-S Oct 5 GDH28 ACIS-I GDH28 ACIS-I Abell141 ACIS-S Radiation Belts Oct 6 Abell141 ACIS-S [FSR2007]1758 ACIS-I SDSSJ002620.87+01151 ACIS-S GDH28 ACIS-I Oct 7 GDH28 ACIS-I GDHIdp53 ACIS-I GDHIdp53 ACIS-I CLJ002048.1+013506 ACIS-I [FSR2007]1758 ACIS-I RMJ003423.2+005126.1 ACIS-I QSOJ0041-4936 ACIS-I Oct 8 Radiation Belts 2MASXJ17253053-4510 ACIS-S Oct 9 Abell2744 ACIS-I CMZMolecularCloud ACIS-I RAqr ACIS-S CMZMolecularCloud ACIS-I
------------------------------------------
All spacecraft subsystems except HRC continued to support nominal operations.
Return to Status Reports