Friday 6 January 2023 9.00am EST
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jan 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below and includes an observation of SDSSJ163810.07+1151 coordinated with the Hobby-Eberly Telescope. |
------------------------------------------
Radiation Belts Jan 9 SDSSJ163810.07+1151 ACIS-S SDSSJ144706.81+2128 ACIS-S SDSSJ074922.96+2255 ACIS-S SRGEJ170245.2+13010 ACIS-S IRAS09104+4109 ACIS-S Jan 10 NGC5127 ACIS-S UGC03995A_s2 ACIS-S SRGEJ170245.2+13010 ACIS-S IRAS09104+4109 ACIS-S Jan 11 PSZ2G063.38+53.44 ACIS-I SDSSJ101747.09+3932 ACIS-S Radiation Belts Jan 12 2MASSJ08194059+0823 ACIS-I SRGEJ170245.2+13010 ACIS-S SDSSJ082758.52+23330 ACIS-S SRGEJ170245.2+13010 ACIS-S DELSJ091054.53-0414 ACIS-I SDSSJ151727.68+1333 ACIS-S Jan 13 SDSSJ144624.29+1731 ACIS-S 2MASSJ08194059+0823 ACIS-I ESO223-006 ACIS-I eFEDSJ091453.6+0416 ACIS-S SDSSJ085443.10+0752 ACIS-S LEDA3078020 ACIS-S eFEDSJ091453.6+0416 ACIS-S Jan 14 SPT-CLJ0311-6354 ACIS-I Radiation Belts RXJ0806.4-4123 ACIS-I eFEDSJ091453.6+0416 ACIS-S Jan 15 RXJ0806.4-4123 ACIS-I [GMV2015]ASW0009io9 ACIS-S SWIFTJ0722.5+2121 ACIS-I CXOUJ232327.8+58484 ACIS-S
------------------------------------------
All spacecraft subsystems except HRC continued to support nominal operations.
Return to Status Reports