CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 7 April 2006 8.00am EDT
During the last week Chandra completed the observing schedule as
planned.
Real-time procedures were executed on 5 April to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer, and to perform a diagnostic dump of the Central Processing Electronics (CPE). A Chandra press release was issued on April 6 describing observations of the detection in X-rays of a proto supermassive binary black hole. For details see: http://chandra.harvard.edu/press/06_releases/press_040606.html The schedule of targets for next week is shown below. |
------------------------------------------
NGC 1365 ACIS-S Apr 10 A2717 ACIS-I SDSS J220445.36+00 ACIS-S NGC 7090 ACIS-S Sgr A* ACIS-I Apr 11 Radiation Belts HD104237A (DX Cha) ACIS-S/HETG NGC 1365 ACIS-S Apr 12 DG Tau ACIS-S RXC J1324.1+1358 ACIS-S CG 12 ACIS-I Apr 13 HD104237A (DX Cha) ACIS-S/HETG Radiation Belts AM 0630-353 ACIS-S Apr 14 NGC 1365 ACIS-S ELAIS-S1 E ACIS-I CG 12 ACIS-I Apr 15 RXJ 1131-1231 ACIS-S CG 12 ACIS-I DB2001 CL-123 ACIS-I UGC6860 ACIS-S Apr 16 HD104237A (DX Cha) ACIS-S/HETG
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports