Friday 15 December 2023 9.00am EST
During the last week, following observation of higher than predicted HRC Central Electronics Assembly (CEA) temperatures and the application of an improved HRC thermal model to upcoming observations, it was concluded that future HRC observations were at risk of causing the CEA temperature to exceed its 12 C limit. On Dec 8 at 8:59pm EST, a real time procedure was executed to prevent subsequent HRC observations in the weekly loads from running. The procedure completed nominally and disabled SCSs 92, 93, and 134. There were no remaining HRC observations in the scheduling week beginning on Dec 4. The eight scheduled HRC observations in the approved loads beginning Dec 11 can no longer execute and result in science idle time. They will be rescheduled at a later date. ACIS observations are continuing as scheduled. Another real time procedure was executed on Dec 8 to uplink a patch to reduce the charge current minimum limit to account for expected aging of solar arrays. Real-time procedures were executed on Dec 9-11 to dump OBC-A and -B memory as a follow-up to the flight software patch on Dec 8. The dump will be used to update the baseline memory images maintained on the ground. Of note this week was the release on Dec 14 of the Cycle 26 Call
for Proposals. The proposal submission deadline is 14 March 2024.
In conjunction with the call was the release on Dec 12 of the CIAO
("Chandra Interactive Analysis of Observations") version 4.16
analysis software system, Chandra CalDB ("Calibration Database")
version 4.11, SAOImage DS9 (the astronomical imaging and data
visualization application) version 8.5, and MARX (the Chandra
on-orbit performance simulator) version 5.5.3. For details see:
https://cxc.cfa.harvard.edu/proposer The schedule of targets for the next week is shown below and includes observations of OrionNebulaCluster coordinated with the VLBA. |
------------------------------------------
SPT-CLJ0114-4123 ACIS-I Dec 18 SDSSJ112637.74+5134 ACIS-S RMon ACIS-S Radiation Belts Dec 19 MKN421 ACIS-S/LETG Z147-20 ACIS-S SDSSJ150527.17+2341 ACIS-S SDSSJ150748.33+5511 ACIS-S Z147-20 ACIS-S 7C1754+6737 ACIS-S DELSJ091054.53-0414 ACIS-I Dec 20 RMon ACIS-S SDSSJ115229.13+0821 ACIS-S RMon ACIS-S 7C1754+6737 ACIS-S OrionNebulaCluster ACIS-I LMCDeepField01 ACIS-I Dec 21 OrionNebulaCluster ACIS-I Radiation Belts MKN421 ACIS-S/LETG SDSSJ074941.16+2627 ACIS-S Dec 22 1ES_1101m232_s3 ACIS-S OrionNebulaCluster ACIS-I LMCDeepField01 ACIS-I UGC3157 ACIS-S MGJ2019+1127 ACIS-S UGC3157 ACIS-S Dec 23 MGJ2019+1127 ACIS-S HEPG176.473-01.635 ACIS-I MGJ2019+1127 ACIS-S 2MASXJ04543180+5240 ACIS-S [APH2018]SDSSJ1020 ACIS-I Radiation Belts Dec 24 MKN421 ACIS-S/LETG [APH2018]SDSSJ1020 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports