News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 3 May 2024 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on May 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the CPE.

The schedule of targets for the next week is shown below and includes an observation of V1723Sco, which was accepted as a Director's Discretionary Time Target of Opportunity on Apr 12.



------------------------------------------
        HE1338-1423            HRC-S /LETG  May  5
        eFEDSJ083933.8-0140    ACIS-S       May  6
        PKS1418-064            ACIS-S
        SDSSJ075438.45+4232    ACIS-S
        Radiation Belts                     May  7
        V1723Sco               ACIS-S/HETG
        SNRG21.5-0.9           HRC-S
        WISEAJ122612.12+244    ACIS-S
        TXS1834+612            ACIS-S       May  8
        PSZ2G000.04+45.13      ACIS-I
        PSZ2G356.53+28.66      ACIS-I
        E0102-72.3             ACIS-I
        NGC6242                ACIS-I       May  9
        PROCYON                HRC-I
        IC4518A                ACIS-S
        Radiation Belts
        LMCDeepField03         ACIS-I
        SC1329-313             ACIS-I       May 10
        E0102-72.3             ACIS-S
        SC1329-313             ACIS-I
        SDSSJ133857.08+3635    ACIS-S       May 11
        SNRG21.5-0.9           HRC-I
        SDSSJ090920.44+0044    ACIS-S
        SC1329-313             ACIS-I
        SDSSJ085711.68+0124    ACIS-S
        SC1329-313             ACIS-I       May 12
        Radiation Belts
        SC1329-313             ACIS-I
        PSZ2G178.94+56.00      ACIS-I
        SC1329-313             ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports