CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 2 August 2024 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Jul 31 to swap the prime solid-state recorder (SSR) from the A-side to the B-side. This swap concludes a six-month interval of health and trending data collection on SSR-A. The schedule of targets for the next week is shown below and includes observations of SS433 coordinated with Swift and an observation of CenA, which was accepted as a Director's Discretionary Time Target of Opportunity on Jul 16. |
------------------------------------------
Radiation Belts Aug 4 M31* ACIS-I LP758-43 ACIS-S CXOUJ232327.8+58484 HRC-S Aug 6 PSZ2G045.50-37.21 ACIS-I WISEAJ214604.77-000 ACIS-S CXOUJ232327.8+58484 HRC-S SDSSJ130235.17+2726 ACIS-S SS433 ACIS-S/HETG CenA ACIS-S/HETG Aug 7 SPT-CLJ0101-5332 ACIS-I Radiation Belts XMMUJ183239.7-09161 ACIS-I SS433 HRC-I Aug 8 M31* ACIS-I LMCDeepField10 ACIS-I MOOJ2132-3054 ACIS-I Aug 9 SPT-CLJ0101-5332 ACIS-I Radiation Belts Aug 10 Abell370 ACIS-I SPT-CLJ2214-5501 ACIS-I Aug 11 PKS2008-159 ACIS-S HZ43 HRC-S /LETG
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports