News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 9 August 2024 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on Aug 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE).

The schedule of targets for the next week is shown below and includes an observation of AT2024qfm, which was accepted as a Target of Opportunity on Aug 1 and is coordinated with NuSTAR.



------------------------------------------
        PSRJ2021+3651          ACIS-S       Aug 11
        1E2215.7-0404/1E       ACIS-I       Aug 12
        Radiation Belts                     Aug 13
        1E2215.7-0404/1E       ACIS-I
        SDSSJ033553.12-0039    ACIS-S
        LMCDeepField08         ACIS-I
        1E2215.7-0404/1E       ACIS-I       Aug 14
        LMCDeepField07         ACIS-I
        VIKINGJ231818.3-311    ACIS-S
        4U1624-490             ACIS-S/HETG  Aug 15
        Radiation Belts
        AT2024qfm              ACIS-S
        NGC6242                ACIS-I       Aug 16
        2RXSJ213736.6-20255    ACIS-S
        4U1624-490             ACIS-S/HETG
        VIKINGJ231818.3-311    ACIS-S       Aug 17
        PGC170437              ACIS-S
        SDSSJ162549.66+4806    ACIS-S
        PSRJ2021+3651          ACIS-S
        Radiation Belts                     Aug 18
        1E2215.7-0404/1E       ACIS-I
        SDSSJ111836.35+6316    ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports