Friday 6 September 2024 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Chandra passed through the 7th, 8th, and 9th eclipses of the season on Aug 31, Sep 3, and Sep 5 respectively, with nominal power and thermal performance. Real-time procedures were executed on Sep 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below and includes observations of Her X-1, which was accepted as a Target of Opportunity on Aug 16. |
------------------------------------------
GAL034.8-00.6IRDC ACIS-I Sep 8 1E2215.7-0404/1E ACIS-I Sep 9 GAL034.8-00.6IRDC ACIS-I 1E2215.7-0404/1E ACIS-I 70OPH HRC-I Sep 10 herx-1 ACIS-S/HETG CasA (4 obs) ACIS-I CasA (4 obs) ACIS-S Radiation Belts Sep 11 NGC6204 ACIS-I trappist-1 HRC-S trappist-1 HRC-S herx-1 ACIS-S/HETG PerseusCluster ACIS-I Sep 12 IGRJ18303-3345 ACIS-S trappist-1 HRC-S trappist-1 HRC-S SS433e0 ACIS-I trappist-1 HRC-S Sep 13 trappist-1 HRC-S B31428+422 ACIS-S Radiation Belts NGC6242 ACIS-I G29-38 HRC-I Sep 14 eMACSJ1658.6+1519 ACIS-I DESJ2349-5113 ACIS-I IGRJ17342-4049 ACIS-S Sep 15 SPT-CLJ2233-5552 ACIS-I 1E2215.7-0404/1E ACIS-I SDSSJ151354.48+1451 ACIS-S G29-38 HRC-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports