News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 6 September 2024 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Chandra passed through the 7th, 8th, and 9th eclipses of the season on Aug 31, Sep 3, and Sep 5 respectively, with nominal power and thermal performance.

Real-time procedures were executed on Sep 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE).

The schedule of targets for the next week is shown below and includes observations of Her X-1, which was accepted as a Target of Opportunity on Aug 16.



------------------------------------------
        GAL034.8-00.6IRDC      ACIS-I       Sep  8
        1E2215.7-0404/1E       ACIS-I       Sep  9
        GAL034.8-00.6IRDC      ACIS-I
        1E2215.7-0404/1E       ACIS-I
        70OPH                  HRC-I        Sep 10
        herx-1                 ACIS-S/HETG
        CasA (4 obs)           ACIS-I
        CasA (4 obs)           ACIS-S
        Radiation Belts                     Sep 11
        NGC6204                ACIS-I
        trappist-1             HRC-S
        trappist-1             HRC-S
        herx-1                 ACIS-S/HETG
        PerseusCluster         ACIS-I       Sep 12
        IGRJ18303-3345         ACIS-S
        trappist-1             HRC-S
        trappist-1             HRC-S
        SS433e0                ACIS-I
        trappist-1             HRC-S        Sep 13
        trappist-1             HRC-S
        B31428+422             ACIS-S
        Radiation Belts
        NGC6242                ACIS-I
        G29-38                 HRC-I        Sep 14
        eMACSJ1658.6+1519      ACIS-I
        DESJ2349-5113          ACIS-I
        IGRJ17342-4049         ACIS-S       Sep 15
        SPT-CLJ2233-5552       ACIS-I
        1E2215.7-0404/1E       ACIS-I
        SDSSJ151354.48+1451    ACIS-S
        G29-38                 HRC-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports