CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 10 January 2025 9.00am EST
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jan 8 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Jan 13
NGC1300 ACIS-S
SDSSJ082730.64+1921 ACIS-S
PSRJ1418-6058 ACIS-I Jan 14
A1795 ACIS-I
SDSSJ082730.64+1921 ACIS-S
PSRJ1418-6058 ACIS-I
Abell795 ACIS-S Jan 15
PSOJ170.8326+20.208 ACIS-S
SDSSJ131012.35+1656 ACIS-S
Radiation Belts Jan 16
NGC1300 ACIS-S
Abell795 ACIS-S
Abell370 ACIS-I
NGC2775 ACIS-S Jan 17
SDSSJ145138.27+0903 ACIS-S
NGC2775 ACIS-S
SDSSJ160158.51+4705 ACIS-S
HD75332 HRC-I
IGRJ15550-4306 ACIS-I Jan 18
NGC4781 ACIS-S
Radiation Belts
Abell370 ACIS-I
ZwCl0857.9+2107 ACIS-S Jan 19
Abell370 ACIS-I
NGC2775 ACIS-S------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

