CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 26 May 2006 9.00am EDT
During the last week Chandra completed the observing schedule as
planned.
Of note last week was a disruption on May 24 in the flow of real-time and dump data from DSN to the OCC. JPL resolved the issue without data loss, and all backlogged data have now been received and processed. The schedule of targets for next week is shown below and includes an observation of Kelu-1 coordinated with the VLA. |
------------------------------------------
Radiation Belts May 28 CNOC 1447+09 ACIS-I May 29 Vega HRC-I May 30 Vega (4 obs) HRC-S RGB1324+576 ACIS-S Kelu-1 ACIS-S UGC6985 ACIS-S May 31 SDSSJ1238+5325 ACIS-S Radiation Belts A3125 ACIS-I Jun 1 XMMU J005510.7-37385 HRC-I Sgr A* ACIS-I RXJ1856.5-3754 HRC-I CG 12 ACIS-I Jun 2 FIRST 1556+3517 ACIS-S NGC 3610 ACIS-S Radiation Belts Jun 3 A3120 ACIS-I 1RXS J094247.2+70023 HRC-I Jun 4 NGC2552 ACIS-S RS Oph HRC-S/LETG SGR 1900+14 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports