Friday 16 June 2006 11.00am EDT
During the last week Chandra completed the observing schedule as
planned.
Power to the OCC was disrupted for 15.5 hours on 13 Jun due to planned construction activity in the building. Power to all operational required operations equipment was provided by the emergency gas generator for the outage and there was no impact to operations. Preparations are complete for the Cycle 8 Peer Review to be held in Boston next week. The schedule of targets for next week is shown below and includes an observation of GX340+0 coordinated with the VLA and RXTE. |
------------------------------------------
Radiation Belts Jun 19 HD93250 ACIS-S/HETG RXC J1110.5+2842 ACIS-S Jun 20 P1 ACIS-I P6 ACIS-I P10 ACIS-I P13 ACIS-I Dwingeloo 1 ACIS-I SDSS J0121+1448 ACIS-S Jun 21 GX 340+0 ACIS-S/HETG Radiation Belts HD93250 ACIS-S/HETG Jun 22 PSRJ1617-5055 ACIS-I HD93250 ACIS-S/HETG Jun 23 SC1604+4323 ACIS-I SDSSJ0132-0952 ACIS-S Jun 24 Radiation Belts SC1604+4323 ACIS-I Q0948+4323 ACIS-S Jun 25 NGC 3432 ACIS-S NGC 3413 ACIS-S SDSS J100711.82+05 ACIS-S Q1225+0035 ACIS-S HD 150798 HRC-I Q2237+0305 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports