CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 4 August 2006 8.00am EDT
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was conducted on July 31 to uplink a flight software patch to OBC-B to add on-board monitoring of selected propulsion line and valve temperatures. This completes the procedure conducted on July 27 during which the patch was uplinked to OBC-A. The schedule of targets for next week is shown below and includes an observation of 4U 1820-30 coordinated with RXTE and the VLA. |
------------------------------------------
HZ43 HRC-S/LETG Aug 7 IRAS05436-0007 ACIS-I A3074 ACIS-I Radiation Belts Aug 8 GS 1826-238 ACIS-S/HETG Radiation Belts Aug 11 GS 1826-238 ACIS-S/HETG Q1431+3952 ACIS-S Aug 12 SDSS J160207.6+380 ACIS-S M81* ACIS-S/HETG 1RXS J155705.0+383 ACIS-S 4U 1820-30 ACIS-S/HETG A3074 ACIS-I Aug 13
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports