Friday 11 August 2006 8.00am EDT
During the last week Chandra completed the observing schedule as
planned.
An Aspect Camera dark current calibration was performed from the on-board loads on 7 August. A real-time procedure was executed on 9 August to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A Chandra press release was issued on 8 August describing how Chandra data have been used to independently determine the Hubble Constant. The new value matches recent measurements using other methods and extends their validity to greater distances. For details see: http://chandra.harvard.edu/press/06_releases/press_080806.html The schedule of targets for next week is shown below and includes observations of 4U 1735-44, GX 17+2 and GX 349+2 coordinated with both RXTE and the VLA. |
------------------------------------------
Radiation Belts Aug 13 CLASS B2108+213 ACIS-S Aug 14 Bootes2 (12 obs) ACIS-I GLIMPSE-C01 ACIS-S Aug 15 Radiation Belts Aug 16 Bootes2 (3 obs) ACIS-I Q2237+0305 ACIS-S A2717 ACIS-I Aug 17 4U 1735-44 ACIS-S/HETG XMMU J182830-11451 ACIS-S Bootes2 (6 obs) ACIS-I Aug 18 Radiation Belts GRB 010222 ACIS-S Aug 19 HESS J1837-069 ACIS-I GX 17+2 ACIS-S/HETG GX 349+2 ACIS-S/HETG Aug 20 Bootes2 (7 obs) ACIS-I UGC8745 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports