During the last week Chandra completed the observing schedule as
planned.
Chandra passed through a penumbral lunar eclipse on 24 August with nominal power and thermal performance. A real-time procedure was conducted on 24 August to test the HRC +Y shutter select function. During the test, three select/de-select cycles were run and confirmed full functionality of the relay. The test verified that after two years without use the +Y shutter has not been impacted by the same failure mode as the -Y shutter. A Chandra media telecon was held on August 21 describing observations of the galaxy cluster 1E 0657-56 that provide direct evidence of the existence of dark matter. For details of this important release, see: http://chandra.harvard.edu/photo/2006/1e0657/ The schedule of targets for next week is shown below. |
------------------------------------------
NGC5585 ACIS-S Aug 28 NGC7796 ACIS-S B2224+65 ACIS-S UGC0968 ACIS-S SDSS J1236+6554 ACIS-S Aug 29 Radiation Belts Abell 1995 Field 1 ACIS-I Aug 30 Trumpler 16 ACIS-I UGC7797 ACIS-S Aug 31 Radiation Belts B2224+65 ACIS-S Sep 1 NGC 326 ACIS-S Sep 2 NGC7796 ACIS-S Sep 3
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports