Friday 8 September 2006 9.00am EDT
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was executed on 7 September to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for next week is shown below and includes an observation of IGR J00291+5934 coordinated with ground-based observations. |
------------------------------------------
IZw107 ACIS-S Sep 11 P5 ACIS-I Vega HRC-I Vega (3 obs) HRC-S Radiation Belts M33 Field 3 ACIS-I Sep 12 IGR J00291+5934 ACIS-S Sep 13 G292.0+1.8 ACIS-I Radiation Belts Sep 14 G12.7-0.0 ACIS-I XMMU J2235.3-2557 ACIS-S Sep 15 Deep GCS 10 ACIS-I P12 ACIS-I SDSS J1421+4633 ACIS-S SDSS J1407+6454 ACIS-S SDSS J1438+4314 ACIS-S 1RXS J151855.1+355 ACIS-S Q2237+0305 ACIS-S Sep 16 PSR J1112-6103 ACIS-S GCRT J1746-2757 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.