News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 8 September 2006 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on 7 September to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for next week is shown below and includes an observation of IGR J00291+5934 coordinated with ground-based observations.

------------------------------------------
IZw107                  ACIS-S       Sep 11
P5                      ACIS-I
Vega                    HRC-I
Vega  (3 obs)           HRC-S
Radiation Belts
M33 Field 3             ACIS-I       Sep 12
IGR J00291+5934         ACIS-S       Sep 13
G292.0+1.8              ACIS-I
Radiation Belts                      Sep 14
G12.7-0.0               ACIS-I
XMMU J2235.3-2557       ACIS-S       Sep 15
Deep GCS 10             ACIS-I
P12                     ACIS-I
SDSS J1421+4633         ACIS-S
SDSS J1407+6454         ACIS-S
SDSS J1438+4314         ACIS-S
1RXS J151855.1+355      ACIS-S
Q2237+0305              ACIS-S       Sep 16
PSR J1112-6103          ACIS-S
GCRT J1746-2757         ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports