News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 15 September 2006 7.30am EDT

During the last week Chandra completed the observing schedule as planned.

A realtime procedure was completed on September 14 to update the on-board Ephemeris.

The schedule of targets for next week is shown below and includes a series of 42 calibration observations of the target AR Lac and an observation of 1E 1048.1-5937 coordinated with HST.

------------------------------------------
Radiation Belts                      Sep 16
1H 1905+000             ACIS-S       Sep 17
M33 Field 5             ACIS-I
SAX J1818.6-1703        ACIS-S       Sep 19
1H 1905+000             ACIS-S
Radiation Belts
1H 1905+000             ACIS-S       Sep 20
AR Lac (21 obs)         HRC-I
RXC J1134.8+4903        ACIS-S       Sep 21
AR Lac (21 obs)         HRC-S
Radiation Belts                      Sep 22
1H 1905+000             ACIS-S
P8                      ACIS-I       Sep 23
1E 1048.1-5937          ACIS-S
RCW36                   ACIS-I
P7                      ACIS-I       Sep 24
M31                     ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports