CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 24 November 2006 9.00am EDT
During the last week Chandra completed the observing schedule as
planned.
Of note last week was the approval by the Flight Director Board to decrease the Aspect Camera CCD set point from -15 deg C to -20 deg C. The decrease will offset the gradual increase in warm pixels seen in the Aspect Camera CCD as the mission progresses. The lower set point will improve image centroiding, improve star acquisition success and reduce the risk of stars being dropped due to nearby warm pixels. The schedule of targets for next week is shown below and includes a DDT observation of the source RBS1774 (1RXS J214303). |
------------------------------------------
RBS1774(1RXS J214303) HRC-I Nov 26 ABELL370 ACIS-I C-COSMOS2-6 ACIS-I Radiation Belts Nov 27 EQ Peg ACIS-S/HETG CL0024+17 ACIS-I Nov 28 M33 Field 7 ACIS-I EQ Peg ACIS-S/HETG Nov 29 Q2237+0305 ACIS-S Radiation Belts EQ Peg ACIS-S/HETG Nov 30 Abell 562 ACIS-S IRAS 07251-0248 ACIS-S Dec 1 IRAS 13120-5453 ACIS-S HR4796 HRC-I C-COSMOS2-6 ACIS-I Dec 2 IGR J06074+2205 ACIS-S Radiation Belts EQ Peg ACIS-S/HETG Dec 3 MACS0329.7-0212 ACIS-I Orion Trapezium Cluster ACIS-S/HETG C-COSMOS2-6 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports