During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was executed on Mar 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for next week is shown below and includes observations of M31 coordinated with XMM-Newton, Cygnus X-1 coordinated with RXTE, and 4U 1735-44 coordinated with RXTE and the VLA. |
------------------------------------------
SDSS J032515.59+00 ACIS-S Mar 11 M31 HRC-I Cyg X-2 HRC-I Cygnus X-1 ACIS-I AX J194622+2436 ACIS-S Mar 12 M87 ACIS-S SDSS J122845.74+00 ACIS-S VFXT 1 ACIS-I Sn 1987A ACIS-S/HETG NGC 685 ACIS-S NGC 1315 ACIS-S Radiation Belts Sn 1987A ACIS-S/HETG Mar 13 GroupID2868 ACIS-S Mar 14 NGC 1341 ACIS-S A3822 ACIS-I NGC 3887 ACIS-S M87 ACIS-S HZ43 HRC-S/LETG NGC4848 ACIS-S 2MASX J134907+0504 ACIS-S Mar 15 4U 1735-44 ACIS-S/HETG Radiation Belts GRB 060729 ACIS-S Mar 16 NGC 3125 ACIS-S GRB 060729 ACIS-S Mar 17 SDSS J0317-0758 ACIS-S WR146 ACIS-I 1833 ACIS-S Abell 1201 ACIS-I Sn 1987A ACIS-S/HETG
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports