Friday 10 August 2007 9.00am EDT
During the last week Chandra completed the observing schedule as
planned.
The data from an Aspect Camera dark current calibration conducted on Aug 7 were lost due to a DSN station anomaly and a repeat calibration will be rescheduled as soon as practical. A real-time procedure was executed on Aug 8 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A Chandra image release was issued on Aug 8 of two supernova remnants, G347.3-0.5 and RCW 86, that combine XMM-Newton wide-field data with Chandra high resolution images to investigate energy production and particle acceleration mechanisims. For further details see: http://chandra.harvard.edu/photo/2007/2snr The schedule of targets for the next week is shown below. |
------------------------------------------
J1848-12 ACIS-I Aug 12 XTE J1701-462 ACIS-S AX J144547-5931 ACIS-S W40 ACIS-I Radiation Belts Aug 13 2MASX J010103-0134 ACIS-S Aug 14 Betelgeuse HRC-S NGC 5548 HRC-S/LETG IGR J17522-2657 HRC-I Aug 15 AX J1754.2-2754 HRC-I Radiation Belts Aug 16 FLS6 ACIS-I RSG Cluster 2 ACIS-I Aug 17 HCG 92 ACIS-S Radiation Belts Aug 18 RXJ1648.7+6019 ACIS-S Aug 19
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports