CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 6 August 1999 7.00am EST
The following is an overview of the events that occurred over the last 24 hours.
Measured optical cavity pressure of 8.3 E-06 Torr. Pressure has been reduced from 8.6 E-06 in the last 24 hours.
Continued ACIS calibrations. Continued development of burn strategy and command loads for IPS #5. Continued Earth Scans to update Chandra attitude reference accuracy. Events scheduled for the next 24 hours |
Return to Status Reports