News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Saturday 7 August 1999 7.00am EST

The following is an overview of the events that occurred over the last 24 hours. Performed IPS #5 burn. All systems performed nominally. Based on a preliminary state vector input from DSN which was taken 5 hours post burn, the Chandra orbit has a 9652km perigee and 139,188km apogee. This orbit is within the range of perigee altitudes with acceptable Earth/lunar eclipse durations and is acceptable for Chandra operation. When confirmed with the next state vector update in approximately 12 hours, this will be declared the final operational orbit.

Measured optical cavity pressure of 8.1 E-06 Torr. Pressure has been reduced from 8.3 E-06 in the last 24 hours

Testing with the vehicle is currently underway to determine if residual propellant sloshing during maneuvering will adversely affect PCAD performance.

Evaluated Aspect Camera performance sensitivity as a function of HRMA thermal control system operation. Performance was consistent with pre-test predictions.

Continued ACIS calibrations.

Events scheduled for the next 24 hours
  • Continue ACIS calibrations.
  • Obtain final State Vectors from DSN and confirm final orbit.