News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Saturday 14 August 1999 7.00am EST

The Chandra mission continues to proceed nominally.

The following is an overview of the events that occurred over the last 24 hours.

Perform IRU Scale Factor misalignment procedure - Perform maneuvers to determine Gyro frame misalignment matrix, and successfully update Gyro to Aspect Camera Assembly Transformation Matrix.

The Optical Cavity pressure in down to 4.5X10-06. The HRC I and S detectors high voltage were successfully raised to their full potential of 1520kV and 1760kV respectfully for the first time on-orbit.

Completed Normal Pointing Mode Checkout - Demonstrated normal Pointing Control and Aspect Determination (PCAD) operations, including maneuvering, auto-transfer to Normal Pointing mode, Orbital Flight Program (OFP) commanded search for stars (based on OFP star catalog) and FID lights, and Kalman filter operations with and without dithering.

Transfer to Chandra Phase II timeline. Upload Offline System mission load for 40 hour period starting 6:45am EDT Saturday.

Offline System (OFLS) scheduling of mission loads. Started performing maneuvers and test observations controlled from onboard Real Time Sequences (RTS) derived in the OFLS instead of real time ground commands. This load will control the Chandra until about midnight Sunday.

Activities for next 24 hours.
  • Continue on-board RTS directed Chandra operations.






Return to Status Reports