News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Thursday 19 August 1999 7.00am EST

The following is an overview of the events that occurred over the last 24 hours.

On-site Operations personnel, and members of the Technical Support Team and factory support team completed Safemode recovery procedure review and test. Safemode recovery was initiated at 1:30pm EDT Wednesday and was successfully completed about 10:20 pm. Chandra was commanded back to A-side hardware, and Pointing control was transferred from the Command Processing Electronics (CPE) Assemble to the On-Board Computer (OBC) A. OCC personnel are in the process of performing cleanup activities including; moving the SIM back to the ACIS-S position, and re-establishing attitude knowledge. This activity is continuing as planned, based on Deep Space Network ground station availability. Activities for next 24 hours: Re-establish configuration for mission operation, and resume science observations.