CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Monday 1 May 2000 8.30am EDT
During the last week, Chandra completed the observing schedule as planned.
One real-time procedure is planned during the next week to continue testing the ACIS "squeegee mode". The test scheduled for 4:45pm on 5/1 will use the same number of CCD rows as for the 4/15 test (8 and 16), but with reduced parallel transfer times. The test is intended to verify that the energy resolution improves on-orbit in the same manner as in lab tests. The planned observations for next week are as follows. |
------------------------------------------
NGC 3603 ACIS-I May 1 PMN J1131+0455 ACIS-S May 2 NGC 4579 ACIS-S CL 0848.6+4453 ACIS-I May 3 Radiation Belts CL 0848.6+4453 ACIS-I May 4 NGC 4261 ACIS-S May 5 M82 ACIS-I May 6 Radiation Belts SN 1993J ACIS-S May 7 Abell 1995 ACIS-S
------------------------------------------
Note that a request for a Target of Opportunity was made on 4/30 and is under assessment. If the TOO is approved, the next status report will include the schedule revisions made to accommodate the observations.
The spacecraft subsystems continued to operate nominally.
Return to Status Reports