News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 24 November 2000 6.00pm EST

Happy Thanksgiving from the Chandra Team!

During the last week, Chandra completed the observing schedule as planned.

Real-time procedures were completed to insert and then retract the LETG for the Target Of Opportunity Aql X-1 observation on Saturday 18 Nov. Both the insertion and retraction were nominal.

The Aspect Camera Dark Current Calibration procedure was run on 20 November during a 5 hour communications pass. This is the first time the procedure has been completed since the dark current calibration was measured prior to Sun Shade Door opening, and will provide a valuable data set for monitoring the ACA performance. Initial assessment indicates that all five data sets taken during the procedure have no gaps, and will provide a solid baseline.

The planned observations for the coming week are as follows.

------------------------------------------
Aql X-1 (TOO Part 2)    ACIS-S       Nov 26 
SS 433                  ACIS-S/HETG  Nov 27 
N103B                   ACIS-S/HETG
Radiation Belt          None         Nov 28 
U Gem                   ACIS-S/HETG  Nov 29 
Vela Pulsar             ACIS-S       Nov 30 
1136-135                ACIS-S
4U2129+47               ACIS-S
Radiation Belt                       Dec 1  
SDSS1204-0021           ACIS-S
NGC 3628                ACIS-S       Dec 2  
Monoceros R2            ACIS-I

------------------------------------------

All spacecraft subsystems continued to operate nominally.