News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 11 July 2003 11.00am EDT

During the last week Chandra completed the observing schedule as planned.

The IRU-1 gyro-1 current remained quiet and near 150 mA during the last week. The plan for swapping to IRU-2 on Jul 19 remains on schedule.

The targets recommended for acceptance from the Cycle-5 Peer review were posted on July 11. For details see: http://cxc.harvard.edu/target_lists/index.html.

A Chandra image release of the active galaxy NGC 1068 was made on July 9. This composite X-ray and optical image shows gas blowing away in a high-speed wind from the vicinity of a central supermassive black hole. For details see: http://chandra.harvard.edu/photo/2003/ngc1068/index.html.

The observing schedule for next week is shown below and includes an observation of 1150+495 coordinated with the Hubble Space Telescope.

------------------------------------------
Radiation Belts                     Jul 14
Markarian 1066         ACIS-S
Markarian 290          ACIS-S/HETG
PSR J1913+1011         ACIS-S       Jul 15
Markarian 290          ACIS-S/HETG
Radiation Belts                     Jul 16
Markarian 290          ACIS-S/HETG  Jul 17
1150+495               ACIS-S
V4743 Sgr              HRC-S/LETG   Jul 18
CLUS 214228-442029     ACIS-S

------------------------------------------

All spacecraft subsystems, with the exception of the MUPS thruster A-1 under investigation, continued to operate nominally.

Return to Status Reports