Friday 22 August 2003 1.00pm EDT
During the last week Chandra completed the observing schedule as planned.
A realtime procedure was completed on 18 Aug to recover data from SSR-A after it became full and recording autonomously switched to SSR-B. SSR-A filled following problems with a DSN pass and was unloaded during a rescheduled pass. A small data loss was incurred and recording was switched back to the A-side on Aug 19. Of note last week was the shipping of the Avionics and Software Validation Test Set (ASVT) from NGST Space Park to the OCC in Cambridge. The equipment will arrive 25 Aug and be fully checked out prior to resuming operational use. The ASVT has been operated remotely by the Flight Operations Team since launch. The observing schedule for next week is shown below and includes TOO followup observations of XTE J1810-197 and Eta Car. |
------------------------------------------
Radiation Belts Aug 25 SDSS J020845.53+002236 ACIS-S Aug 25 F01572+0009 ACIS-S Aug 26 SDSS J233853.83+004812 ACIS-S Aug 26 HD 220657 ACIS-S/HETG Aug 26 NGC4750 ACIS-S Aug 27 NGC 5204 X-1 ACIS-S Aug 27 F15250+3609 ACIS-S Aug 27 XTE J1810-197 HRC-I Aug 27 Radiation Belts Aug 27 Eta Car ACIS-S Aug 28 A1763 ACIS-I Aug 28 VW CEP ACIS-S/HETG Aug 29 Radiation Belts Aug 30 3C296 ACIS-S Aug 31 Sagittarius DSPH ACIS-I Aug 31
------------------------------------------
All spacecraft subsystems, with the exception of the MUPS thruster A-1 under investigation, continued to operate nominally.
Return to Status Reports