During the last week Chandra completed the observing schedule as planned.
The Avionics and Software Validation Test Set (ASVT) arrived at the OCC on 24 Aug and was unloaded and set-up by the West Coast team without incident. Checkout of the system and training is proceeding on schedule this week. Testing is complete for a flight software patch that will modify the threshold criteria for triggering science instrument safing under high radiation conditions. The change is expected to significantly reduce the number of unwanted triggers just prior to radiation belt entry. The patch is planned for uplink on 2 Sept. The observing schedule for next week is shown below and includes a series of 21 calibration observations of AR Lac. |
------------------------------------------
AR Lac (21 obs) HRC-S Sep 1 PC 0041+0215 ACIS-S UGC 408 ACIS-S Radiation Belts Sep 2 1E0953.8+6918 ACIS-S A1914 ACIS-I Sep 3 DLS J1402-1028 ACIS-I RXJ1347.5-1145 ACIS-I 2MASS222221+195947 ACIS-S Sep 4 FIRST J010032-020046 ACIS-S F00188-0856 ACIS-S A0119 ACIS-I Radiation Belts NGC 5204 X-1 ACIS-S Sep 5 MS1455.0+2232 ACIS-I HD73952 ACIS-I Sep 6 NGC 7793 ACIS-S
------------------------------------------
All spacecraft subsystems, with the exception of the MUPS thruster A-1 under investigation, continued to operate nominally.
Return to Status Reports