Friday 10 October 2003 11.30
During the last week Chandra completed the observing schedule as planned.
The HRC team is actively investigating the cause for the HRC -Y shutter anomaly and have traced its origin to a limited number of components in the motor control electronics. Since some of these components are used in the operation of the HRC door, the team has recommended that once the door is opened for the next HRC observation it remain open at least until those components are exonerated. While the HRC door will not be moved so that it blocks low-energy protons from reaching the detectors during radiation zone passages, early mission experience indicates that there is minimal-to-no risk of degradation to the HRC from radiation with the door in this open position. The observing schedule for next week is shown below and includes an observation of EXO 0748-676 coordinated with RXTE. |
------------------------------------------
Radiation Belts Oct 12 EXO 0748-676 HRC-S/LETG EXO 0748-676 ACIS-S/HETG Radiation Belts Oct 14 EXO 0748-676 ACIS-S/HETG Oct 15 Radiation Belts Oct 17 PSR B1509-58 ACIS-I MACS-J2129.4-0741 ACIS-I Oct 18 SGR 1900+14 ACIS-S G11.4-0.1 ACIS-I
------------------------------------------
All spacecraft subsystems continue to support nominal operations.
Return to Status Reports