CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 19 December 2003 9.00am EST
During the last week Chandra completed the observing schedule as planned.
A real-time procedure was completed on Dec 12 to update the on-board ephemeris. Preparations are on track for the completion of a 2-week mission planning load that will cover the new-year period. The observing schedule for the next week is shown below and includes an observation of M31 coordinated withe Hubble Space Telescope. |
------------------------------------------
Radiation Belts Dec 22 NGC 2362 ACIS-I RXJ0513.9-6951 HRC-S/LETG Dec 24 E0102-72 ACIS-S E0102-72 ACIS-S Radiation Belts M31 ACIS-I Dec 25 RX J1914.4+2456 ACIS-S 1E 1415.6+2557 HRC-I HR 5392 ACIS-I Dec 26 MACS911.2+1746 ACIS-I Mrk 1210 ACIS-S NGC4697 ACIS-S ESO 428-G014 ACIS-S Dec 27 Radiation Belts HH 184 ACIS-I Dec 28 0820+225 ACIS-S PSR J1210-5226 HRC-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports