CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 6 March 2009 9.00am EST
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was executed on Mar 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below. |
------------------------------------------
RCS1330+3043 ACIS-S Mar 8 SDSSJ1202+5119 ACIS-S 3C35 ACIS-I NGC7196 ACIS-S Mar 9 AXJ182538-1214 ACIS-S SDSSJ1413-0238 ACIS-S Radiation Belts AEGIS-3 ACIS-I 3C236W ACIS-I Mar 10 NGC4203 ACIS-S AEGIS-3 ACIS-I Mar 11 Arp240 ACIS-S HZ43 HRC-I/LETG M31 ACIS-I BRC34 ACIS-I Radiation Belts Mar 12 AEGIS-3 ACIS-I AXJ182216-1425 ACIS-S SPT-CL2359-5009 ACIS-I EVLac ACIS-S/HETG Mar 13 SDSSJ120331.29+1522 ACIS-S Mar 14 GRB090102 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports