During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was completed on May 18 to update the on-board ephemeris. A second procedure was conducted on May 21 to perform a routine dump of the OBC memory. The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts May 25 GRB090423 ACIS-S Abell2052 ACIS-S GRB090423 ACIS-S May 27 Radiation Belts May 28 PKS2155-304 ACIS-S/LETG J0045+1339 ACIS-S NGC2314 ACIS-S SDSSJ0133-1026 ACIS-S M31 ACIS-I May 29 G21.5-09 (3 obs) ACIS-S Alpha Centauri HRC-I Abell 2052 ACIS-S G21.5-09 ACIS-S May 30 Radiation Belts SDSSJ004459.24-08532 ACIS-I UGC04483 ACIS-S May 31 SDSSJ232428.43+1443 ACIS-S 1RXSJ220221.0+015353 ACIS-S M17 ACIS-S/HETG
------------------------------------------
All spacecraft subsystems continued to support nominal operations.