News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 29 May 2009 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was conducted on May 29 to activate SCS 29 in preparation for the start of the 2009 summer eclipse season. The season will last between May 30 and Jun 28 and includes 12 eclipses.

A Chandra press release was issued on May 28 describing the discovery of a cosmic "ghost" surrounding a distant supermassive black hole. This is the first detection of such a high-energy apparition, and scientists think it is evidence of a huge eruption produced by the black hole. For details see: http://chandra.harvard.edu/press/09_releases/press_052809.html

The schedule of targets for the next week is shown below and includes an observation of Abell 2052 coordinated with the VLA.

------------------------------------------
Radiation Belts                    Jun  2
M17O4-O4 binary        ACIS-S/HETG
PSRJ1852+0040          ACIS-S
NGC 6300               ACIS-S      Jun  3
SPT-CL0509-5342        ACIS-I
1RXSJ084830.4-694114   ACIS-S
Abell 2052             ACIS-S
GRB090423              ACIS-S      Jun  4
Radiation Belts
Abell 2052             ACIS-S      Jun  5
NGC 4051               ACIS-S
1823+568               ACIS-S      Jun  6
J1833-087              ACIS-S
AXJ155035-5408         ACIS-S
AXJ150436-5824         ACIS-S
HESSJ1507-622          ACIS-I
NGC 6300               ACIS-S      Jun  7

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports