News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 31 July 2009 9.00am EDT

Operations CXO Status Report, 31 July 2009, 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on July 27 to obtain MUPS pressure and temperature data at a higher rate to assist in diagnosing the cause of the drop in pressure readings. The same real-time procedure was executed on July 30.

Work continued on the fault tree analysis of the MUPS tank pressure reading drop, with focus on false readings from the pressure sensor or a leak.

The schedule of targets for the next week is shown below

------------------------------------------
NGC6681                ACIS-S       Aug  3
HNTau                  ACIS-S       Aug  4
Radiation Belts
NGC922                 ACIS-S       Aug  5
M82-SE                 ACIS-S
M87                    ACIS-S       Aug  6
AXJ181915-1601         ACIS-S
AXJ175404-2553         ACIS-S
IGRJ17419-2802         ACIS-I
IGRJ17314-2854         ACIS-I
HESSJ1741-302          ACIS-I
Radiation Belts                     Aug  7
SwiftJ195509.6+2614    ACIS-S
G18.95-1.1             ACIS-I       Aug  8
IGRJ17475-2253         HRC-I
IGRJ17505-2644         HRC-I
IGRJ17585-3057         HRC-I
IGRJ17353-3539         HRC-I        Aug  9
VelaPWN                ACIS-S
Arp293                 ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.