Operations CXO Status Report

Friday 13 August 2010 9.00am EDT

During the last week the observing schedule was replanned to include a 60 ks observation of the source H 1743-322 that was accepted as a fast turn-around Target Of Opportunity (TOO) on Aug 6. The loads were replanned to remove observations of PSRB0906-49, SDSSJ130802.04+5538, SDSSJ135920.99+5137, and SDSSJ142610.59+4411, which will be rescheduled in future weeks. The replanned loads were uplinked on Aug 7.

A real-time procedure was completed on August 12 to update the on-board ephemeris.

The schedule of targets for the next week is shown below

------------------------------------------
SLJ1337.7+3800         ACIS-I       Aug 15
SDSSJ110501.97+5941    ACIS-S       Aug 16
PGC1202458             ACIS-S
NGC1340                ACIS-S
PSRJ0821-4300          ACIS-S
0FGLJ1018.2-5858       ACIS-I       Aug 17
AUMicroscopii          HRC-I
A3695                  ACIS-I
Radiation Belts
SN1987A                HRC-I        Aug 18
SN1993J                ACIS-S
Abell2146              ACIS-I       Aug 19
NGC5582                ACIS-S
PSRB0531+21            HRC-S/LETG
Abell2443              ACIS-S       Aug 20
Radiation Belts
Abell2146              ACIS-I
NGC4157                ACIS-S       Aug 21
NGC953                 ACIS-S       Aug 22
NGC7590                ACIS-I
RXJ1958.2-3011         ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.