CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 22 October 2009 9.00am EDT
During the last week the observing schedule was replanned to include
two 7 ks observation of the source Aql X-1 that were accepted as
Targets of Opportunity on Oct 15. Scheduled observations of HFPK 334
and 3C 93.1 were impacted by the TOO and will be rescheduled in a
later load.
A real-time procedure was executed on Oct 17 to dump a region of OBC memory as part of a test of a new software interface to the Deep-Space Network. A second real-time procedure was executed on Oct 21 to update the on-board ephemeris. The Einstein Fellows Symposium was held on Oct 19-20. Presentations were made by the 27 current Fellows, covering a wide range of topics in observational and theoretical astrophysics research. The schedule of targets for the next week is shown below and includes a follow-up TOO observation of Aql X-1 and DDT observations of XTE J1810-197 and the Crab. |
------------------------------------------
J135541.1+402706 ACIS-S Oct 24 3C319 ACIS-S Oct 25 XTEJ1810-197 ACIS-S Radiation Belts ACTJ0346-5438 ACIS-I 1843+356 ACIS-S Oct 26 J163316.7+352010 ACIS-S G299.2-2.9 ACIS-I 3C63 ACIS-S Oct 27 G299.2-2.9 ACIS-I Radiation Belts Oct 28 ACTJ0346-5438 ACIS-I Crab ACIS-S G299.2-2.9 ACIS-I HE0435-1223 ACIS-S Oct 29 J003756.0-091500 ACIS-S Oct 30 AqlX-1 ACIS-S G299.2-2.9 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports