Friday 24 December 2010 9.00am EST
During the last week the observing schedule was replanned to include a
20ks observation of GRB101219A that was accepted as a Target of
Opportunity on Dec 19. A planned observation of ACT J0438-5419 was
impacted and will be rescheduled at a later date.
Real-time procedures were executed on Dec 17-18 to dump OBC-A memory as a follow-up to the gyro scale-factor and alignment matrix patch. The dump will be used to update the baseline memory image maintained on the ground. A second real-time procedure was completed on Dec 22 to update the on-board ephemeris A Chandra press release was issued on Dec 20 describing a new study from Chandra that tells scientists how often the biggest black holes have been active over the last few billion years. This discovery clarifies how supermassive black holes grow and could have implications for how the giant black hole at the center of the Milky Way will behave in the future. For details see: http://chandra.harvard.edu/press/10_releases/press_122010.html The Mission Planning team worked hard to develop a 2 week schedule to cover the holiday period as shown below. The schedule includes an observation of Cyg X-1 coordinated with RXTE. |
------------------------------------------
3A1954+319 ACIS-S/HETG Dec 26 MACSJ0712.3+5931 ACIS-I Dec 27 PGC32033 ACIS-S GZ_merger_AGN_5 ACIS-I Radiation Belts Dec 28 2M04414825 ACIS-S SDSSJ0812+5225 ACIS-S AKARI-NEP-DeepField ACIS-I GJ338 HRC-S/LETG Dec 29 L5-V4 ACIS-I Dec 30 L6-L9 ACIS-I Radiation Belts PNA6630 ACIS-S 6C0850+3747 ACIS-S Jan 1 AKARI-NEP-DeepField ACIS-I L4 ACIS-I Jan 2 Radiation Belts DLSCLJ0916+2953 ACIS-I J084255.61+331822.58 ACIS-S Jan 3 3C305 ACIS-S A3581 ACIS-S Radiation Belts Jan 4 J090508.85+074151.24 ACIS-S Jan 5 1RXSJ044048.0+292440 ACIS-S NGC2683 ACIS-S 3C305 ACIS-S Jan 6 CygX-1 ACIS-S/HETG Abell665 ACIS-I Radiation Belts Jan 7 3C198 ACIS-S GZ_merger_AGN_7 ACIS-I HBC515 ACIS-S Jan 8 GZ_merger_AGN_1 ACIS-I AKARI-NEP-DeepField ACIS-I VERJ2019+407 ACIS-I Abell665 ACIS-I Jan 9
------------------------------------------
All spacecraft subsystems continued to support nominal operations.