Friday 7 January 2011 9.00am EST
During the last two weeks Chandra completed the observing schedule as planned.
A real-time procedure was executed on Jan 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was completed on Jan 6 to update the on-board ephemeris. The schedule of targets for the next week is shown below |
------------------------------------------
Radiation Belts Jan 10 SPT-CL0324-6236 ACIS-I ESO137-002 ACIS-S SDSSJ145828.64+01323 ACIS-S Jan 11 PGC1223766 ACIS-S Jan 12 SDSSJ0945+1009 ACIS-S GZ_merger_AGN_4 ACIS-I 1624+049 ACIS-S A2457 ACIS-I SPT-CL0324-6236 ACIS-I Radiation Belts M31 ACIS-I Jan 13 BlancoCosmological ACIS-S A2204_Field4 ACIS-I LeoT ACIS-S 0907+049 ACIS-S Jan 14 RMCPL1 ACIS-I BlancoCosmological ACIS-S Crab ACIS-S XMMUJ0954+1738 ACIS-S Jan 15 Radiation Belts BlancoCosmological ACIS-S NGC1589-OT ACIS-S Jan 16 IRAS05589+2828 ACIS-S XMMUJ0954+1738 ACIS-S 1FGLJ1511.9-2253 ACIS-I Jan 17 BlancoCosmological ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports