Friday 21 January 2011 9.00am EST
During the last week Chandra completed the observing schedule as planned.
An aspect camera dark current calibration was performed from the on-board loads on Jan 18. Assessment of the data indicates nominal aspect camera performance and that the number of CCD warm pixels is increasing at the expected rate. A real-time procedure was executed on Jan 20 to update the on-board ephemeris. Of note last week was the conduct on Jan 19-20 of the Einstein Fellows Peer Review. The schedule of targets for the next week is shown below |
------------------------------------------
CID-42 HRC-I Jan 24 PSRJ1658-53 ACIS-S Jan 25 HD157214 ACIS-S DR15 ACIS-I Radiation Belts ACTJ0102-4915 ACIS-I Jan 26 PKS0745-19 ACIS-S Jan 27 J104439.4+384541 ACIS-S Jan 28 Radiation Belts 3C438cluster ACIS-S Jan 29 1FGLJ0622.2+3751 ACIS-I NGC3367 ACIS-S SDSS1004+4112 ACIS-S Jan 30 PGC57841 ACIS-S 3C438cluster ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports