Friday 4 March 2011 9.00am EST
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was executed on Mar 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was completed on Mar 2 to update the on-board ephemeris. The schedule of targets for the next week is shown below and includes observations of SIX-2 and SIX-4 that are coordinated with a ground-based observatory. |
------------------------------------------
Radiation Belts Mar 6 XMMUJ1243+1313&J1 ACIS-S Mar 7 SIX-2 ACIS-I SDSSJ1252+2640 ACIS-S AKARI-NEP-DeepField ACIS-I AKARI-NEP-DeepField ACIS-I PSRJ1958+2846 ACIS-I Mar 8 3C410 ACIS-S AKARI-NEP-DeepField ACIS-I M31 HRC-I AKARI-NEP-DeepField ACIS-I 1RXSJ130205.2+155122 ACIS-S Mar 9 PSS1326+0743 ACIS-S 1RXSJ144701.1+11453 ACIS-S GZ_merger_AGN_12 ACIS-I Radiation Belts AKARI-NEP-DeepField ACIS-I SIX-4 ACIS-I Mar 10 Abell3112 ACIS-I BR0351-1034 ACIS-S A853 ACIS-I Abell1668 ACIS-S Mar 11 A1795 (4 obs) ACIS-I Radiation Belts Mar 12 A1795 (2 obs) ACIS-I A1882a ACIS-S NGC3393 ACIS-S Mar 13 ACTJ0215-5212 ACIS-I Mar 14 SN1987A ACIS-S/HETG
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports